TITLE: 05/23 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 9mph Gusts, 4mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
IFO is in ENGINEERING and aligning
Now with all chambers vented, we are aligning cavities with the following done today and yesterday:
Continuing to align cavities until we can make it through an initial alignment (and if the stars align too, potential full IFO locking)