TITLE: 05/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 4mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
The goal is to start locking and follow the steps outlined in the commissioning document https://docs.google.com/document/d/1P6JXVV_bhdN2M5k2PLoa0tu-AmY-PiC98zZ0nzBIJ2I/edit?tab=t.0
H1 Is currently going through a manual Initial alignment " Without Green Cameras".