jodi.fauver@LIGO.ORG - posted 10:46, Monday 11 November 2013 (8458)
Apollo work for 11 Nov 2013
The re-assembly of the Test Stand cleanroom was started at Y End and continued for most of the day. Mark Layne went into BSC3 to re-install the two ICC Dust Barriers (slots off-set and covered with taped on foil) between BSC2 and BSC3. This activity was completed by 10:45 am. After the cleaning crew completed their work this morning, Bubba and Mark L. worked on the BSC9 viewports. The two viewports on the door were attached (FC on both sides) but not torqued. There was some confusion associated with the illuminator and video camera viewports: the serial numbers on the documentation did not match up with the viewports on hand. Bubba consulted with Keita and then we unsuccessfully tried to track down (H2 PSL enclosure x 3 calls with no answer, VPW, desk) Joe D. to clarify the issue. If Keita can't find Joe in the PSL enclosure later today, we will talk to Joe in the morning.
Displaying report 1-1 of 1.