Displaying report 1-1 of 1.
Reports until 19:12, Friday 08 November 2013
H1 TCS (AOS, TCS)
greg.grabeel@LIGO.ORG - posted 19:12, Friday 08 November 2013 - last comment - 10:54, Monday 11 November 2013(8452)
TCS install BSC 1,2,3
Alastair H. Thomas V. Joe D. Greg G.
The install of the steering mirrors went really smoothly today. Alignment will for Y-Arm will begin this weekend.
Images attached to this report
Comments related to this report
greg.grabeel@LIGO.ORG - 10:54, Monday 11 November 2013 (8459)AOS, TCS
Alastair H. Thomas V. Joe D. Greg G.

A rough alignment for ITM-Y was done on Sunday using the temporarily attached TCS viewport, a tripod, and a laser. The alignment went really smoothly with the only roughness being fighting the SM2 mount. 

BSC 1 had the blank removed and was temporarily fitted with the TCS viewport. The TCS viewport has been failing leak test checks due to a leak issue with the viton seal and the wedged optics. Using a laser and a tripod mount we approximated the TCS periscope location and shot down to Steering Mirror 1 in BSC 1 then to Steering Mirror 2 in BSC 2 and back to ITM-Y.

The next step is to repeat this for ITM-X when the BSC 3 door can be put up on the East side and the West door removed.
Displaying report 1-1 of 1.