TITLE: 05/28 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 14mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.11 μm/s
QUICK SUMMARY: H1 locking continues this evening; currently have made it up to CARM_TO_ANALOG and have paused to measure CARM OLG. More SQZ table work also going on.