TITLE: 05/30 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 17mph Gusts, 9mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.11 μm/s
QUICK SUMMARY:
IFO is LOCKING at PREP_ASC_FOR_FULL_IFO
NLN alignment recovery is still ongoing as we attempt to get past the next few states, at which we have been losing lock.
It seems that IFO is not set up for a good PRC align so we have been skipping that in the initial alignment.