TITLE: 06/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 15mph Gusts, 8mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.22 μm/s
QUICK SUMMARY:
H1 was down for the night, so will most likely run an alignment and then go for Power 10W and then assess.