corey.gray@LIGO.ORG - posted 16:31, Monday 02 June 2025 (84709)
Mon DAY Ops Summary

TITLE: 06/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

Much of today was work in ASC land with H1 locked most of the day at 10W (but started powering up at the end of the shift) and also had the arrival of even more members of the Syracuse LSC Team!  But there was also work on the Squeezer toward the end of the day.  The plan for tomorrow's Maintenance Day is to continue with Vent Recovery locking work.

Rahul addressed rung up violin modes from this morning and he requested the Oli (EVE operator) to apply these settings new settings (noted in alog 84720).

The day started out with the drama of a fire out beyond End-Y (Fire Dept phoned the Control Room notifying us that they were fighting a fire on SR240 (see attached photo from the roof of the Corner Station).