Displaying report 1-1 of 1.
Reports until 12:24, Monday 19 May 2025
H1 SYS
betsy.weaver@LIGO.ORG - posted 12:24, Monday 19 May 2025 - last comment - 15:13, Monday 02 June 2025(84464)
HAM1 closeout final chamber checks
For chamber closeout finalization, this morning I 

* placed a 3" contam control wafer on the center of the HAM1 table today
* took a few last pics, removed the stowed 3x septum covers (missed removing the 4th one from the septum, thanks vac good eye, pic 4)
* looked around for left behind tools
* retraced the beam path to look for errand in-the-way cables (none observed)
* inspected under and around lower area of table for left goods (none found)
* cleaned up last tool pans to get ready for doors
* particle counts were <50 all sizes, zero most often
* purposefully coiled the to-be-used in post O4 next vent cable with the peek connector not grounding to anything - it sits in the PSL side door well below the table

* all subsytems have signed for doors, so we are putting doors on.
Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 15:13, Monday 02 June 2025 (84723)EPO

Tagging for epo

Displaying report 1-1 of 1.