Reports until 16:15, Monday 02 June 2025
H1 General
oli.patane@LIGO.ORG - posted 16:15, Monday 02 June 2025 (84725)
Ops Eve Shift Start

TITLE: 06/02 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 11mph Gusts, 5mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.31 μm/s
QUICK SUMMARY:

We are sitting in POWER_10W, and have been here for the past several hours. Currently commissioners are still working on the CHARD, INP1, and PRC2 loops, kind of having to swap between all three as they slowly get them better (84711, 84724).