TITLE: 06/03 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Just had another lockloss so I'm just putting the detector in IDLE for the night. I have a list of things from Elenna to check/try with relocking, but I won't be able to get to any of them before the end of my shift, so they can be checked tomorrow morning. This last lockloss was during OFFLOAD_DRMI_ASC while I was trying to adjust SRM, although I don't think I caused the lockloss? It took a while for DRMI to catch this time, so maybe running an initial alignment is warranted. The highest state we were able to get to today was LOWNOISE_LENGTH_CONTROL.
The list Elenna gave me is:
LOG:
23:00UTC Commissioning and sitting in POWER_10W
23:20 Started trying to increase power
01:49 Lockloss from LOWNOISE_LENGTH_CONTROL while sitting there running measurements
- Started a manual initial alignment
- Stopped at PRX_LOCKED, touched up PRM, then finished IA
- Stopped at OFFLOAD_DRMI_ASC, touched up SRM, then continued
- Lockloss in DRMI_TO_POP
- Probably due to DRMI alignment not being the greatest
- Stopped at OFFLOAD_DRMI_ASC, touched up SRM, SR2, and PRM, then continued
- Lockloss in LOWNOISE_ESD_ETMX due to a CHARD P ringup that started in TRANSITION_FROM_ETMX
- Lockloss from OFFLOAD_DRMI_ASC while I was trying to touch up alignment using SRM. Not sure if my fault?