TITLE: 06/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 5mph Gusts, 2mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.27 μm/s
QUICK SUMMARY:
IFO is in DOWN for PLANNED ENGINEERING
Today is a light maintenance day in with the plan being to continue locking H1 to NLN.
The highest state we are able to get to is: LOWNOISE_LENGTH_CONTROL.