Reports until 07:36, Tuesday 03 June 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:36, Tuesday 03 June 2025 (84740)
OPS Day Shift Start

TITLE: 06/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 5mph Gusts, 2mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.27 μm/s
QUICK SUMMARY:

IFO is in DOWN for PLANNED ENGINEERING

Today is a light maintenance day in with the plan being to continue locking H1 to NLN.

The highest state we are able to get to is: LOWNOISE_LENGTH_CONTROL.