Reports until 16:30, Tuesday 03 June 2025
H1 General
oli.patane@LIGO.ORG - posted 16:30, Tuesday 03 June 2025 (84765)
Ops Eve Shift Start

TITLE: 06/03 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 12mph Gusts, 6mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.22 μm/s
QUICK SUMMARY:

We lost lock from LOWNOISE_LENGTH_CONTROL a bit ago, so we are working on relocking. Plan for the rest of the day: