Displaying report 1-1 of 1.
Reports until 22:21, Tuesday 03 June 2025
H1 General
oli.patane@LIGO.ORG - posted 22:21, Tuesday 03 June 2025 (84784)
Ops Eve Shift End

TITLE: 06/04 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Just put the detector in DOWN for the night (and for Matt's IM test tonight). Elenna and I have been unable to fully lock DRMI for the past hour:

State of today's tasks (posted in my shift start alog, here are their updates):

LOG:

22:55UTC Lockloss from LOWNOISE_LENGTH_CONTROL due to commissioner error
23:30 Lockloss from ENGAGE_DRMMI_ASC
02:37 Lockloss during LASER_NOISE_SUPPRESSION
    - ran a manual initial alignment
03:48 Lockloss from ACQUIRE_DRMI_1F due to the limit for DC6 being set to 0 and ISC_DRMI thinking that DC6 was railed (84782)
03:52 Lockloss from FIND_IR
04:00 Lockloss from ENGAGE_DRMI_ASC due to fast oscillation (same as 84769)
04:21 Lockloss from ACQUIRE_DRMI_1F due to fast oscillation (same as 84769)
04:36 Lockloss from ACQUIRE_DRMI_1F
04:43 Lockloss from ACQUIRE_DRMI_1F

Displaying report 1-1 of 1.