LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:39, Wednesday 04 June 2025 (84804)
OPS Day Shift Summary

TITLE: 06/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

IFO is in NLN_CAL_MEAS and PLANNED ENGINEERING

Extremely productive day in which we got to Nominal Low Noise for the first time in two months!

Very briefly, here's what we did today:

Relevant alogs:

alog 84800: low range coherence checks

alog 84798: a2l optimized pre-NLN

alog 84796: IM4 and MC2 TRANS

There are undoubtedly more in-progress alogs about work done today.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:30 LASER LASER HAZARD LVEA LASER HAZARD LVEA IS LASER HAZARD (\u2310\u25a0_\u25a0) 07:26
14:39 FAC Herc Lift Lift MX N Lifting a lift 15:05
17:11 FAC Randy MX N Inventory 20:10
17:29 VAC Travis MY N Checking storage space 17:44
20:54 AOS Jeff, Jordan Optics Lab Local SPI Collimator 21:06
20:55 VAC Travis MY N Inventory 20:55