TITLE: 06/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
IFO is in NLN_CAL_MEAS and PLANNED ENGINEERING
Extremely productive day in which we got to Nominal Low Noise for the first time in two months!
Very briefly, here's what we did today:
Relevant alogs:
alog 84800: low range coherence checks
alog 84798: a2l optimized pre-NLN
alog 84796: IM4 and MC2 TRANS
There are undoubtedly more in-progress alogs about work done today.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:30 | LASER | LASER HAZARD | LVEA | LASER HAZARD | LVEA IS LASER HAZARD (\u2310\u25a0_\u25a0) | 07:26 |
14:39 | FAC | Herc Lift Lift | MX | N | Lifting a lift | 15:05 |
17:11 | FAC | Randy | MX | N | Inventory | 20:10 |
17:29 | VAC | Travis | MY | N | Checking storage space | 17:44 |
20:54 | AOS | Jeff, Jordan | Optics Lab | Local | SPI Collimator | 21:06 |
20:55 | VAC | Travis | MY | N | Inventory | 20:55 |