TITLE: 06/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
IFO is in LOCKING_ALS and PLANNED ENGINEERING
A very productive day whereby we discovered that on Fri, we LHO needs to vent HAM1 to briefly reseal the +Y door. This begun a rush to get a calibrated IFO before that vent. In order, here's what happened.
VAC Morning Maintenance:
Vacuum entered at varound 8:15 AM PT to determine where their detected annulus pump leak was. The day prior, they had found that it was in one of the HAM1 doors. This morning, they found that it is the +Y door, which requires the movement of ISCT1 to access. They then told the rest of the lab at the 10 AM PT comissioning meeting. We have to vent on Fri Jun 6. Vacuum will attempt to vent and pump down all within the weekend still prepped for a Wed O4 restart. VAC was out at 10:30 AM PT and we began locking right after.
Locking and the Calibration Sweep Rush:
Armed with the knowledge tat IFO would be down for comissioning starting tomorrow, it was determined that we needed to get at least one thermalized NLN calibration sweep so we began locking:
The plan for tonight is to try and get a calibration sweep ahead of maintenance tomorrow.
Relevant Alogs and Other Investigations:
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:30 | LASER | LASER HAZARD | LVEA | LASER HAZARD | LVEA IS LASER HAZARD (\u2310\u25a0_\u25a0) | 14:55 |
14:43 | OPS | TJ | LVES | YES | Laser safe transition | 14:55 |
15:00 | VAC | Jordan, Gerardo | LVEA | N | HAM1 Annulus Leak Checks | 17:29 |
15:01 | SUS | Randy | LVEA | N | Walkabout (and maybe a forklift lift) | 15:22 |
15:04 | VAC | Janos | LVEA | N | HAM1 Annulus Leak Checks | 17:29 |
15:17 | FAC | Kim, Nellie | LVEA | N | Technical Cleaning (Nellie out 9:25) | 16:37 |
15:23 | FAC | Tyler | LVEA | N | FAMIS Checks | 15:47 |
16:03 | FAC | Richard | LVEA | N | Walkabout for vacuum | 16:08 |
16:08 | EE | Fil | LVEA | N | HAM6 RAcks | 16:40 |
16:43 | ISC | Jennie | LVEA | N | Measuring HAM1/ISCT1 distances | 16:48 |
17:10 | FAC | Nellie, Kim | MX | N | Tech Clean | 18:27 |
17:11 | SUS | Betsy | LVEA | N | Cable Dispatch | 17:30 |
18:28 | VAC | Marc, Janos | LVEA | N | Ion pump cables | 18:35 |
18:32 | VAC | Gerardo, Janos | FCES | N | Wrench Search | 19:32 |
21:10 | PCAL | Rick | PCAL LAB | N | Part search | 23:10 |
22:12 | EPO | Robert, Syracuse Tour | LVEA | N | Roof Tour | 22:47 |