IFO is in LOCKING_ALS and PLANNED ENGINEERING

A very productive day whereby we discovered that on Fri, we LHO needs to vent HAM1 to briefly reseal the +Y door. This begun a rush to get a calibrated IFO before that vent. In order, here's what happened.

VAC Morning Maintenance:

Vacuum entered at varound 8:15 AM PT to determine where their detected annulus pump leak was. The day prior, they had found that it was in one of the HAM1 doors. This morning, they found that it is the +Y door, which requires the movement of ISCT1 to access. They then told the rest of the lab at the 10 AM PT comissioning meeting. We have to vent on Fri Jun 6. Vacuum will attempt to vent and pump down all within the weekend still prepped for a Wed O4 restart. VAC was out at 10:30 AM PT and we began locking right after.

Locking and the Calibration Sweep Rush:

Armed with the knowledge tat IFO would be down for comissioning starting tomorrow, it was determined that we needed to get at least one thermalized NLN calibration sweep so we began locking:

The plan for tonight is to try and get a calibration sweep ahead of maintenance tomorrow.

Relevant Alogs and Other Investigations:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:30 LASER LASER HAZARD LVEA LASER HAZARD LVEA IS LASER HAZARD (\u2310\u25a0_\u25a0) 14:55
14:43 OPS TJ LVES YES Laser safe transition 14:55
15:00 VAC Jordan, Gerardo LVEA N HAM1 Annulus Leak Checks 17:29
15:01 SUS Randy LVEA N Walkabout (and maybe a forklift lift) 15:22
15:04 VAC Janos LVEA N HAM1 Annulus Leak Checks 17:29
15:17 FAC Kim, Nellie LVEA N Technical Cleaning (Nellie out 9:25) 16:37
15:23 FAC Tyler LVEA N FAMIS Checks 15:47
16:03 FAC Richard LVEA N Walkabout for vacuum 16:08
16:08 EE Fil LVEA N HAM6 RAcks 16:40
16:43 ISC Jennie LVEA N Measuring HAM1/ISCT1 distances 16:48
17:10 FAC Nellie, Kim MX N Tech Clean 18:27
17:11 SUS Betsy LVEA N Cable Dispatch 17:30
18:28 VAC Marc, Janos LVEA N Ion pump cables 18:35
18:32 VAC Gerardo, Janos FCES N Wrench Search 19:32
21:10 PCAL Rick PCAL LAB N Part search 23:10
22:12 EPO Robert, Syracuse Tour LVEA N Roof Tour 22:47