ryan.crouch@LIGO.ORG - posted 07:29, Friday 06 June 2025 - last comment - 08:27, Friday 06 June 2025(84848)
OPS Friday day shift start

TITLE: 06/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ryan S
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 11mph Gusts, 5mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.10 μm/s
QUICK SUMMARY:

Comments related to this report
ryan.crouch@LIGO.ORG - 08:18, Friday 06 June 2025 (84849)

I wrangled some SDFs before Daves LSC and OMC model restarts, for SQZ and SQZ_ASC I did not accept them.

Images attached to this comment
camilla.compton@LIGO.ORG - 08:27, Friday 06 June 2025 (84851)

Ryan and I decided to temporarily accepted H1:SQZ-FC_ASC_SWITCH as OFF so that FC optics aren't pulled away after restarts. This will need to be re accepted as ON before we go to Observing.