TITLE: 06/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Corey
SHIFT SUMMARY: We're pumping back down on HAM1.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:14 | ISC | TJ, Camilla | LVEA | N | ISCT1 move, TJ out 15:08 | 15:16 |
14:15 | FAC | Kim, Nelly | LVEA | N | HAM1 cleaning in | 15:31 |
13:59 | OPS | TJ | LVEA | N | Transition to upgrade laser safe | 14:05 |
14:42 | FAC | Richard | LVEA | N | Check in on HAM1 work | 15:00 |
14:47 | VAC | Mitch | LVEA | N | West bay, viton search | 15:00 |
14:57 | VAC | Travis, Janos, Randy | LVEA | N | HAM1 door removal/work | 21:19 |
15:10 | VAC | Janos | LVEA | N | Door removal | 18:31 |
15:22 | OPS | TJ | LVEA | N | Check in with VAC team | 15:27 |
15:36 | OPS | TJ | Garb room | N | Checks | 15:46 |
15:46 | VAC | Gerardo, Fil, Mitch, Randy | LVEA | N | Door work, Mitch & Fil out 17:15, Gerardo out 18:16 | 19:19 |
15:51 | SEI | Jim | LVEA | N | Lock HAM1 HEPI | 16:09 |
17:10 | ISC | Camilla | LVEA | N | Install camera on ISCT1 | 18:01 |
16:00 | SAF | Richard | LVEA | N | Check on HAM1 work | 16:20 |
17:01 | SAF | Richard | LVEA | N | Check on HAM1 work | 17:44 |
17:08 | ISC | Matt, Bin | Optics lab | LOCAL | CO2 check and disassembly | 18:08 |
17:17 | FAC | Kim, Nellie | LVEA | N | Tech clean checks | 17:44 |
17:20 | CDS | Patrick | Office | N | VAC Gauge work LY -> LX | 20:01 |
17:22 | ISC | Keita | LVEA | N | ISCT1 remove old WFS X parts | 19:38 |
17:22 | ISC | Daniel | LVEA | N | ISCT1 work | 18:08 |
17:23 | OPS | TJ | LVEA | N | Check on progress | 17:49 |
17:42 | OPS | TJ | LVEA | N | Check on HAM1 | 18:57 |
17:49 | SEI | Jim, Robert | LVEA | N | HAM1 TF prep, add viton to periscope, locking isi | 18:56 |
18:24 | SAF | Richard | LVEA | N | Check on progress | 18:37 |
18:25 | PSL | Rahul, Rick | H2 PSL room then optics | N | Grab parts | 19:36 |
18:53 | SAF | Richard | LVEA | N | Safety checks | 19:13 |
18:54 | CDS | Erik | Office | N | HWS work | 19:47 |
19:00 | VAC | Gerardo | LVEA | N | Join VAC team, doors back on | 21:38 |
19:03 | VAC | Mitch | LVEA | N | Put parts away | 19:09 |
19:37 | PSL | Rick | Optics lab | N | Put away parts | 19:55 |
19:50 | OPS | TJ | LVEA | N | Check in with VAC team | 19:55 |
20:27 | OPS | TJ | LVEA | N | Talk to VAC team, maybe move ISCT1 back | 21:16 |
20:33 | ISC | Camilla, Georgia | LVEA | N | Move ISCT1 back | 21:15 |
20:57 | SAF | Richard | LVEA | N | Safety checks, ISCT1 wiring with FIl | 22:08 |
21:07 | SEI | Jim | LVEA | N | Unlock HEPI HAM1 | 21:18 |
21:30 | ISC | Sheila, Vicky | Optics lab, East bay | N | Check out stuff | 22:44 |
21:51 | ISC | Camilla | LVEA to optics lab | N | Get big ameristat bag | 22:28 |
22:15 | ISC | Keita | MIds | N | Store parts pulled from ISCT1 | 22:52 |
22:22 | SAF | Richard | LVEA | N | Safety checks | 22:26 |
23:04 | CAL | Francisco | PCAL lab | LOCAL | Open apertures | 23:13 |
Busy day, work completed includes but is not limited to:
Transition LVEA to Laser Safe for Upgrade Period permit
GRD restart (TJ) alog84854 // permit
OMC and LSC model restarts with DAQ restart 1 (CDS team) alog84861 // permit
HWS file work (Erik) alog84865 // permit
HAM1 door prep (including ISCT1 move, alog84850 // permit), removal (VAC team plus many others) permit, and reinstallation
ISCT1 work - new camera and old parts removal (Camilla, Keita, Daniel, Fil) alog84866 // permit, periscope damping with viton (Jim, TJ, Robert) alog84868
h0vaclx unsuccessful alog84871
HAM1_HEPI and SEIPROC model restarts and DAQ restart 2