anthony.sanchez@LIGO.ORG - posted 16:31, Monday 09 June 2025 (84909)
Monday Ops Day Shift report.

TITLE: 06/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Corey
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 18mph Gusts, 9mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.17 μm/s
SHIFT SUMMARY:

Covering for Ryan C.
OFI Returned to aligned... No output. Apparently this is normal.

SRM already aligned by Elenna.
Attempting to start relocking 19:00 UTC
Potential Lockloss from FIND_IR when I requested SEI_ENV to cycle between Maintenance & CALM.

Lots of saturations when we ran through LOWNOISE_COIL_DRIVERS

Unknown Lockloss from Low_Noise ASC ( We manualed over a handful of States and Ended up manualing back to this state.)

Adjusted the ALS polarization of both X and Y arms.
Ran a Manual_Initial_Alignment Finished @ 22:26 UTC

No internet do to a GC switch restart 22:40 UTC. Internet back up a few moments later.


Lots of saturations when we ran through LOWNOISE_COIL_DRIVERS again, we did not lose lock either time.

Lockloss due to DHARD P ring up while in LOW_NOISE_LENGTH_CONTROL.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:47 OPS TJ, Camilla LVEA N -> Y Put in bellows 15:28
14:56 FAC Kim, Nellie LVEA N -> Y Technical clean 15:23
15:03 SAF Richard LVEA N Safety checks 15:20
15:07 OPS TJ LVEA N -> Y LASER hazard transition 15:28
15:20 VAC Jordan & Gerardo LVEA Y Checks & Balances on HAM1 16:00
15:22 FAC LVEA is LASER HAZARD LVEA YES LVEA is LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f(\u239a_\u239a) 22:54
15:24 FAC Kim, Nellie FCES N Tech clean 16:47
15:26 FAC Randy LVEA Y Move forklift to receving 15:56
15:34 VAC Gerardo LVEA Y Open GV2 then GV1 16:00
15:53 ISC Camilla LVEA Y Quick table check 15:55
16:00 FAC Tyler, Chris High bay, MidY N Forklift to mids 18:09
16:03 VAC Gerardo, Jordan EndY N VAC checks 16:40
16:16 ISC Camilla, TJ LVEA Y ISCT1 alignment still 19:55
16:24 ALS Keita Ends N Take pictures of electronics racks 17:07
16:24 ISC Elenna LVEA Y Join table alignment crew 17:56
16:24 ISC Elenna LVEA Y Alignment on ISCT1 16:24
16:47 FAC Kim MidX N Tech clean 18:04
16:48 FAC Nellie MidY N Tech clean 17:38
16:52 VAC Gerardo, Jordan EndY N CP7 checks 17:10
16:57 FAC Richard LVEA N Check out network stuff 17:02
18:01 ISC Elenna LVEA Y Table work 18:59
18:09 ISC Keita MidY N Grab part out of storage 18:24
19:01 CDS Patrick Ey & EX N Getting data from BRS computers 20:23
19:42 FAC Randy LVEA y Looking for tools in LVEA 19:57
19:51 VAC Travis & Tyler MidX N Looking for Cryopump storage space. 21:13
20:32 PEM Marc, Kiet Mid X N Looking at Fiber box connections to vertex Vault 20:50
21:14 VAC Gerardo End Y N Twiddling Vac Valves 21:53
22:44 PCAL Francisco PCAL Lab yes Shutting apatures & laser apatures 23:04

 