Camilla and I swept the LVEA this morning between locks. The VAC team still has HAM1 pumps to turn off and valve in, as well as a setup with a laptop on the Y arm near the manifold, and a turbo on the output arm. They will get to this later in the day. Other notable things found on out walk through:
- Unplugged RF analyzer, SR785 by PSL racks
- Unplugged two extension cords under HAM2/3
- Unplugged dust monitor by BSC8 and moved the network cable to the dust monitor in the beir garten.
- HAM4 cable mechanically grounding to HEPI crossbeam on -Y side.
- Moved a few accelerometer cables draped over HEPI cross beams.