TITLE: 06/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Locking notes
Started Manual_Initial_Alignment
Touched up ALS-Y alignment.
Requested Initial_Alignment_Offloaded on the ALSX&Y Guardians.
Took Align_IFO to Input_Align_Offloaded, then to PRX_LOCKED. Maxed out PRM alignment.
Requested Mich_Bright_Offloaded and then finished the Manual_Initial_Alignment.
15:00 UTC Norco Truck heading down to EY.
TripLite Power plug is still on. Dave is turning it off. 15:55 UTC
16:00 UTC TEST T1572825
Nominal Low Noise Reached 16:15 UTC
Unknown Lockloss from NLN @ 16:18 UTC
Sat in DRMI For a while pushing around the Beam Splitter to get better flashes.
I returned the BS back to its last position when we had left the last IA.
Running the return slider values script in Print Only Mode reveals the following optics needed to move
Before: SUS-PRM_M1_OPTICALIGN_P_OFFSET: -1681.2,
After: SUS-PRM_M1_OPTICALIGN_P_OFFSET: -1679.4,
Before: SUS-PRM_M1_OPTICALIGN_Y_OFFSET: -41.9,
After: SUS-PRM_M1_OPTICALIGN_Y_OFFSET: -35.7,
Before: SUS-PR2_M1_OPTICALIGN_Y_OFFSET: -230.6,
After: SUS-PR2_M1_OPTICALIGN_Y_OFFSET: -228.9,
Before: SUS-SRM_M1_OPTICALIGN_P_OFFSET: 2544.1,
After: SUS-SRM_M1_OPTICALIGN_P_OFFSET: 2532.9,
Eventually we gave up and did another Man.Initial_Alignment. But may be I should have been moving PRM instead of BS.
While relocking there was a temperature excursion in the +Y side of the LVEA. Tyler took a look at it and was able to make the changes needed to reverse it.
15 minutes of NOMINAL_LOW_NOISE & Observing!!! 21:29 - 21:46 UTC !
The Squeeze is not Squoze for 15 minutes.
GRB-Short E572842 22:22 UTC
Three Calibration Sweeps !!! 84932 84940 84949
GRB-Short E572844 @ 23:12 UTC
Kevin K. started some ADF sweeps:
GPS time for start of one ADF sweep
1433628819
Kevin K. also started one more a bit earlier at
1433628286
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:22 | FAC | LVEA is LASER HAZARD | LVEA | YES | LVEA is LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f(\u239a_\u239a) | 22:54 |
14:35 | fac | Eric | Mech Room | N | working in mech room on mezanine | 14:51 |
14:36 | GAC | Nelly & Kim | EY & EX | N | Technical cleaning | 16:36 |
14:44 | FAC | Randy | LVEA | y | finding path and Moving Forklift. | 14:51 |
15:12 | VAC | Gerardo & Travis | LVEA HAM1 | y | Checking VAC Status | 15:20 |
15:33 | FAC | Eric | Mech Mezz | N | Working in mech room on mezanine | 15:50 |
16:01 | PEM | Richard | CER | N | Putting PEM wire Coil back up | 16:16 |
16:21 | FAC | Randy | Mid stations | N | Storing parts. | 17:21 |
16:25 | OPS | Camilla, TJ | LVEA | Y | Sweep the LVEA | 16:52 |
16:48 | VCA | Travis | CER | N | Getting parts | 16:51 |
16:59 | VAC | Jordan | LVEA Output Arm | Y | Shutting down pump | 17:05 |
17:25 | Tour | Jeff +15 GWANW | Control Room & Overpass | N | GWANW tour | 17:26 |
17:26 | Tour | Rick + 4 ET | LVEA Mech Room | y | Giving Tour to ET Scientists | 18:26 |
17:44 | SEI | Patrick | EY | N | Getting USB stick for BSRY | 18:51 |
18:07 | FAC | Chris | ALL Mids & Ends | N | Testing Phone functionality | 18:51 |
18:31 | FAC | Tyler | VAC Prep | N | Storing tools & parts. | 18:46 |
18:55 | Tour | Rick Robert & ET | EY | N | Giving tour to ET scientists | 19:27 |
19:09 | IMC | Sheila | LVEA | Y | Plug in SR75 into psl racks | 19:23 |
23:07 | Tour | Rick, Robert +ET | Roof | N | Heading to the roof for a good view | 23:37 |