TITLE: 06/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
IFO is LOCKING in ACQUIRE_DRMI_1F
(Started my shift cover at around 10AM PT)
Today we had planned commissioning until 21:00 UTC. We were locked for the majority of it, with much of the commissioning time being spent on SQZ.
We experienced a ETM Glitch Lockloss (not human nor environment caused) - alog 85004. After this, we stopped at PRMI_LOCKED to work on PRMI ASC, but after trying for a while and not making much progress, commissioners decided to continue normal locking.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:22 | FAC | LVEA is LASER HAZARD | LVEA | YES | LVEA is LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f(\u239a_\u239a) | 05:18 |
16:05 | PEM | Robert | LVEA | Y | Remove VP covers for CPY evaluation WP#12618 | 22:55 |
17:05 | FAC | Eric | EX | N | EX Chiller Work | 17:35 |
17:06 | FAC | Tyler, Philip the Bee Guy | EX | N | Bee Removal | 17:06 |
17:06 | FAC | Tyler | EX | N | Tyler | 17:06 |
19:16 | PSL | Jennie, Keita | Optics Lab | Local | ISS Work | 22:16 |
21:34 | PEM | Robert | LVEA | YES | Getting LVEA ready for Observing | 22:34 |