Reports until 16:48, Monday 16 June 2025
LHO General
ryan.short@LIGO.ORG - posted 16:48, Monday 16 June 2025 (85099)
Ops Day Shift Summary

TITLE: 06/16 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Busy day of commissioning! See other alogs for details on commissioning activities. H1 is currently relocking automatically and up to TRANSITION_FROM_ETMX.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:22 SAF LASER HAZARD LVEA YES LVEA is LASER HAZARD Ongoing
14:55 FAC Kim MY N Technical cleaning 16:01
14:55 FAC Nelly MX N Technical cleaning 15:49
14:59 FAC Christina MX, MY N Looking for equipment 16:59
15:02 PEM Robert LVEA/CR - Shaker measurements 16:01
15:23 FAC Randy MY N Checking on forklift battery 15:52
16:02 VAC Jordan, Travis LVEA - Isolating HAM1 turbopump 16:20
16:20 PEM Robert LVEA - Checking on things 16:33
16:40 VAC Jordan LVEA - Valve HAM1 turbopump back in 16:43
16:47 PCAL Tony PCAL Yes Serial numbers 17:16
17:48 AOS Betsy, visitors MY N 3IFO shipping planning 18:48
20:09 ISC Keita, Jennie OptLab Local ISS array work 23:36
20:20 PEM Robert LVEA - Sweep LVEA 20:26
20:21 ISC Rahul OptLab Local ISS array work 22:31
20:51 AOS Betsy, Mitchell, Rick, Jason, visitors MY N 3IFO shipping planning 23:51
21:47 CAL Tony PCalLab N Retreiving BNC cable 21:52
22:10 VAC Gerardo, Jordan LVEA YES Grabbing leak detector cart 22:14