Reports until 16:38, Friday 20 June 2025
H1 General
corey.gray@LIGO.ORG - posted 16:38, Friday 20 June 2025 (85194)
Fri Ops DAY Shift Summary

TITLE: 06/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

Today's main activity was supposed to be a Commissioning Time (from 8am-2pm (PDT) [1500-2100utc]), but with a lockloss near the start, much of the commissioing time was focused on troubleshooting for locking issues with DRMI and also ALS (some commissioning tasks happened at the beginning & end of today's Commissioning Period of 8am-2pm (PDT) [1500-2100utc].

ALSO A New NOTE for Operators

  1. It looks like we can now run the usual INITIAL_ALIGNMENT (vs MANUAL_ALIGNMENT), because for IFO_ALIGN, the PRC_ALIGN_OFFLOADED state now looks good (see Elenna's alog85200).  However, Sheila noted, we should be mindful of the BS heating (Camilla's alog84922).  In other words, we should run alignments about 30min after a lockloss (or even 60min)---to allow the BS time to cool down and return to its "nominal" pointing at the beginning of locks.
  2. Elenna has some changes in ISC_LOCK, so after the next lockloss, we'll need to run a LOAD of ISC_LOCK and ACCEPT the SDF Diffs which come up (see Elenna's alog85207).

VAC Note:  There were hopes we could turn OFF the HAM1 Pump, but there is a pressure we need to get below before we can do this, and we were not there today.  Travis mentioned it will have to wait until Monday.
LOG: