Measurement NOTES:
- Posted heads up reminder for the Sat Morning Calibration on the IGWN channel on Mattermost.
- Following instructions (link)
- H1 at NLN for for almost 2hrs55min (over 3hrs at 60W).
- Calibration_Monitor medm screenshot is attached
- 1830-1859 utc Out of Observing for CALIBRATION
- Broadband measurement started at 1434565843.086414 (18:30:25utc)
- Measurement at: /ligo/groups/cal/H1/measurements/PCALY2DARM_BB/PCALY2DARM_BB_20250621T183025Z.xml
- Simullines measurement
- gps START time: 1434566163.985407 (18:35:45utc)
- gps STOP time: 1434567563.816039 (18:59:95utc)
- File written out to: /ligo/groups/cal/H1/measurements/DARMOLG_SS/DARMOLG_SS_20250621T183546Z.hdf5
- File written out to: /ligo/groups/cal/H1/measurements/PCALY2DARM_SS/PCALY2DARM_SS_20250621T183546Z.hdf5
- File written out to: /ligo/groups/cal/H1/measurements/SUSETMX_L1_SS/SUSETMX_L1_SS_20250621T183546Z.hdf5
- File written out to: /ligo/groups/cal/H1/measurements/SUSETMX_L2_SS/SUSETMX_L2_SS_20250621T183546Z.hdf5
- File written out to: /ligo/groups/cal/H1/measurements/SUSETMX_L3_SS/
- 1859 ISC_LOCK taken back to NLN for observing
Attached is a screenshot of the Calibration Monitor + pdf of Pydarm Report