H1 is back to Observing. As noted earlier, took the opportunity to take care of some housekeeping tasks:
- Timing allowed for a 2nd alignment to happen at a time when the BS was cooled off over an hour.
- Alignment above happened after INIT ALIGN was reloaded (to get PRC ALIGN OFFLOADED back into INITIAL ALIGNMENT).
- ISC LOCK was also LOADed.
- DRMI locked up fairly smoothly and automatically.
- H1 hit 60 wats at 1526utc
- Had (2) SDFs diffs (for "H1:LSC-REFL_SUM_{A,B}_IN2GAIN") in CS_ISC related to what Elenna mentions in alog 85206. These were ACCEPTED (see attached).
Next uip: Take the Saturday Morning Calibration in about 2.5hrs *knock on wood*