Sheila reduced the OPO Trans setpoint from 95uw to 80uW (our nominal from before the break), we hope this will make the SQZ less sensitive to chosen angle. She readjusted OPO temp and measured NLG to still be around 8 to 9. We are not sure why this has dropped since last week but she noticed pump depletion when measuring the NLG when the setpoint was at 95uW.