H1 General (Lockloss)
oli.patane@LIGO.ORG - posted 10:54, Wednesday 25 June 2025 - last comment - 13:47, Wednesday 25 June 2025(85327)
Lockloss

Lockloss during commissioning at 2025-06-25 17:52UTC after over 5.5 hours Locked. Cause not known, but probably not commissioning related.

Comments related to this report
oli.patane@LIGO.ORG - 12:56, Wednesday 25 June 2025 (85334)

18:48 Back to NOMINAL_LOW_NOISE

camilla.compton@LIGO.ORG - 13:47, Wednesday 25 June 2025 (85335)TCS

Within the same ~15 seconds of the lockloss, we turned the CO2 powers down form 1.7W each to 0.9W each. In the hope of doing the thermalization tests we tried last week 85238.

We checked the lockloss today and LSC channels at the time last week we turned the CO2s down and see no glitches corresponding with the CO2 waveplate (out of vac) change, we think the lockloss was unrelated.