Displaying report 1-1 of 1.
Reports until 00:31, Friday 15 November 2013
H1 SUS (ISC, SUS)
koji.arai@LIGO.ORG - posted 00:31, Friday 15 November 2013 (8567)
OMCS masses aligned/positioned

[Jeff B, Andres R, Koji A]

Prior to the OMCS TF measurements...

The OMC was fully cabled up (i.e. OMC DCPDs, QPDs, PZTs, DCPD Preamps, 5 BOSEMS)

The height and balance of the OMC glass breadboard on the OMCS were adjusted.

Then BOSEM positions were adjusted so that the flags are centered in the aperture.
The BOSEM longitudinal positions were adjusted so that the flags blocks half of the light.

Displaying report 1-1 of 1.