Reports until 16:30, Monday 14 July 2025
LHO General
ryan.short@LIGO.ORG - posted 16:30, Monday 14 July 2025 (85751)
Ops Day Shift Summary

TITLE: 07/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Two locklosses today, one of which during commissioning time from a M6.8 earthquake out of Panama. The second lockloss we're still recovering from, and even after running an initial alignment, there have been several lockloss at low states, possibly from rising wind speeds.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
22:56 SAF LVEA LVEA YES LVEA IS LASER HAZARD 14:34
14:50 FAC Randy MY N Checking on forklift 15:05
15:46 PEM Robert, Sam LVEA/CR - Accoustic injections 17:55
16:29 FAC Kim MY N Technical cleaning 17:30
16:29 FAC Nellie MX N Technical cleaning 17:13
17:16 FAC Tyler BT near EX N Bees 17:40
17:33 PSL Jason MX N Inventory 18:04
17:59 PEM Robert LVEA - Replacing viewport covers 18:16
22:46 ISS Keita Optics Lab N ISS array work Ongoing