TITLE: 07/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Two locklosses today, one of which during commissioning time from a M6.8 earthquake out of Panama. The second lockloss we're still recovering from, and even after running an initial alignment, there have been several lockloss at low states, possibly from rising wind speeds.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:56 | SAF | LVEA | LVEA | YES | LVEA IS LASER HAZARD | 14:34 |
| 14:50 | FAC | Randy | MY | N | Checking on forklift | 15:05 |
| 15:46 | PEM | Robert, Sam | LVEA/CR | - | Accoustic injections | 17:55 |
| 16:29 | FAC | Kim | MY | N | Technical cleaning | 17:30 |
| 16:29 | FAC | Nellie | MX | N | Technical cleaning | 17:13 |
| 17:16 | FAC | Tyler | BT near EX | N | Bees | 17:40 |
| 17:33 | PSL | Jason | MX | N | Inventory | 18:04 |
| 17:59 | PEM | Robert | LVEA | - | Replacing viewport covers | 18:16 |
| 22:46 | ISS | Keita | Optics Lab | N | ISS array work | Ongoing |