Displaying report 1-1 of 1.
Reports until 17:13, Wednesday 09 July 2025
H1 PSL (ISC, PSL)
keita.kawabe@LIGO.ORG - posted 17:13, Wednesday 09 July 2025 - last comment - 11:25, Tuesday 15 July 2025(85659)
Summary of all ISS PD Array units that are not in use as of now (Randy, Rahul, Jennie, Keita)

Randy moved the 3IFO ISS PD array (S1202968) crate from MY storage to the OSB yesterday (WP). I opened the crate, moved the transport/storage container to the vacuum lab and optics lab to inspect. It was in a good shape except that some upgrade parts weren't there. Since I'm already forgetting what happened to other units, here's the summary.

First about parts.

Next, the summary per unit.

Here's the thing about the PD array plate D1300322 (see attached). The updated version has a wider 100deg conical bore for larger beam clearance because it was found at some point (ECR E1400231) that the clearance was too small for the original bore and the reflection of some PDs will hit the bore wall at an glazing angle instead of hitting the beam dump. It's also easy to imagine that if you fiddle with the alignment for the production unit in chamber, INPUT light on some PDs will hit the bore wall first before hitting the PD surface.

Images attached to this report
Comments related to this report
jennifer.wright@LIGO.ORG - 11:10, Thursday 10 July 2025 (85671)

We have the blue glass beam dumps for the S1202966 unit, they just need cleaned - location  is sitting on top of the unit in the Optics lab.

keita.kawabe@LIGO.ORG - 11:25, Tuesday 15 July 2025 (85765)

I have found a bag with a label "Dirty Assy - not in ISC - single parts w/ s/n's in ICS". Inside the bag was an assembly that is a combination of upgrades and obsolete parts.

  • Base plate (D1300323)
  • A plate BS and two plate mirrors for the array (D1000957-V2 as a kit) and related parts
  • Two blue glass beam dumps
  • PD array elevator assy (D1400140)
    • 50:50 BS (D1002114-V1)
    • PROBABLY ATF 99:1 sampler (but it could be a high reflector of the same size as we have such high reflectors made by ATF in one of the boxes of ISS array spare parts, though I don't know why).
    • Elevator post D1400143
  • Upgrade to elevate the QPD position
    • A kit of posts (D1300718-V3-1 SN 003 and 005, D1300718-V3-2 SN 003, 2pc D1300718-V3-3 SN 003 and 008)
    • QPD mounting plate (D1300719-V2 SN 002)
  • QPD assembly including QPD itself (most likely Q3000) but w/o tilt mechanism
  • Obsolete PD array plate D1300322-V1
  • Old experiment? 2pc of 3mm PD, most likely Excelitas C30665GH.

I'm going to send the upgrade parts to elevate the QPD position to C/B. In addition, I went through all of the boxes we know are somehow related to ISS 2nd loop (again) and found some unused blue glasses.  This means that we have enough parts to produce 3 spares if we have to (though it would be a lot of work).

Here's the inventory list of the 2nd loop spare parts as of now: https://dcc.ligo.org/LIGO-E2500191

Images attached to this comment
Displaying report 1-1 of 1.