Displaying report 1-1 of 1.
Reports until 01:33, Wednesday 16 July 2025
LHO VE (VE)
gerardo.moreno@LIGO.ORG - posted 01:33, Wednesday 16 July 2025 (85788)
Annulus Ion Pump for BSC3 Rails

Signal railed about 6:28 PM local time, I checked trend data for PT120 and no pressure rise noted inside the main volume.  Attached is a 14 hour trend of the pump behavior and PT120 (main volume internal pressure).

System will be evaluated as soon as possible.

Images attached to this report
Displaying report 1-1 of 1.