Reports until 16:29, Sunday 20 July 2025
LHO General
corey.gray@LIGO.ORG - posted 16:29, Sunday 20 July 2025 (85872)
Sun DAY Ops Summary

TITLE: 07/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY:

Flurries of earthquakes from Japan.  Had another HAM6 High Voltage power supply failure.  Able to finally finish the change for removing the SR3 Dither Pitch Offset.  Shift ended with a M6.2 Alaska earthquake which took H1 down.
LOG: