bubba.gateley@LIGO.ORG - posted 16:20, Friday 15 November 2013 (8588)
Apollo
The X arm cryo pump spool was installed at GV 7. Before installation we discovered an I LIGO conical baffle in the spool which we removed. We also reconnected the annulus piping at GV 7.