Reports until 07:40, Monday 21 July 2025
LHO General
corey.gray@LIGO.ORG - posted 07:40, Monday 21 July 2025 - last comment - 07:51, Monday 21 July 2025(85881)
Mon DAY Ops Transition

TITLE: 07/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 113Mpc
OUTGOING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 13mph Gusts, 9mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.06 μm/s
QUICK SUMMARY:

Arriving to a Dust Alarm in the PSL over the last hr (there have been winds around the corner station the last 2hrs but only about 15mph).

For H1 over the last 12 hrs we have had 4 locks (current one is 90min) where 2 (of3) locklosses were ETMx Glitches, and it looks like all reacquisition was automatic overnight.

H1 is scheduled for Commissioning from 15-19utc (8-noonPDT).

Comments related to this report
corey.gray@LIGO.ORG - 07:51, Monday 21 July 2025 (85883)

Notes From Ops Shift Check Sheet

1) Dust Monitor Check Notifications for LVEA5 & LAB2

Ran the "check_dust_monitors_are_working" script the last two mornings and received notifications for the following:

  • *H1:PEM-CS_DUST_LVEA5      WARNING: dust counts did not change, please investigate
  • H1:PEM-CS_DUST_LAB2                      Error: data set contains 'not-a-number' (NaN) entries

2)  Access System "Flashing Doors"

  • EY has (2) flashing doors, but I'm pretty sure this has been ongoing for years.
  • VPW has 3 door issues:  Exterior Roll-up, LDAS entry, Dirty shop entry & Wood shop has Roll-up door issue.

3) LHO Control Room Screenshots & FOMs

  • H1 Glitches (nuc27) not posting (this has been the case for a while)