Displaying report 1-1 of 1.
Reports until 16:30, Tuesday 22 July 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:30, Tuesday 22 July 2025 (85914)
Ops Day Shift End

TITLE: 07/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Long list of maintenance activities checked off for the day (Trello board). Relocking was uneventful, I tried playing with some gains and timers to help catch DRMI faster but I'm unsure this actually helped. We've been observing for 3.5 hours.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
21:06 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 22:03
14:58 CDS/GC Jonathan MSR n GC switch swap 15:24
15:01 PCAL Tony, Francisco PCAL lab yes Prep for todays meas 15:18
15:02 FAC Chris, Eric Ends, Mids, Mech room n Fan lubing 16:36
15:05 FAC Nelly LVEA yes Tech clean 16:16
15:06 SEI Jim EY, EX n HEPI accumulator checks 17:32
15:07 FAC Randy, Mitchell high bay n Fork lift and crane equipment 17:29
15:09 VAC Jordan, Janos MY, EY n Turbopump functionality testing 18:09
15:11 - Betsy LVEA yes Parts hunt 15:47
15:12 IAS Jason LVEA yes FARO health check 18:01
15:16 CDS/SUS Fil EY n sat amp swap 16:02
15:17 SUS Oli CR n Sat amp swap tests, SR3 meas. 18:26
15:22 VAC Norco EX n LN2 fill 17:17
15:26 VAC Gerardo FCTE n Measuring cables 16:03
15:28 PCAL Tony, Francisco, Tooba EY YES PCAL meas. 17:38
15:31 CDS Richard CER Mezz, LVEA Yes Check on OMC PZT power supply 16:03
15:32 SQZ Camilla, Leo, Jennie LVEA YES SQZT7 work 19:18
15:33 CDS Marc, Erik CER Mezz yes Power supply swap for ITM esds 16:26
15:42 VAC Janos MX n Looking at LN2 with contractor 16:06
15:47 - Betsy EY, EX n Checking on safety space 16:02
15:51 CDS/VAC Patrick Office n PLC code update on h0vacmr 16:31
16:06 VAC Janos MY, MX n Checking on vac stuffs 17:29
16:07 VAC Gerardo EX n Checking and maybe fixing vac stuff 16:36
16:17 FAC Nelly EX n Tech clean 17:16
16:38 CDS/SUS Fil, Marc LVEA yes MC1,MC3 sat amp swap 17:02
16:44 FAC Eric MY n Damper fix 18:02
17:13 FAC Chris Mids, Ends, LVEA YES Checking for tanks 18:45
17:16 FAC Nelly FCES n Tech clean 18:02
17:19 - Mike, Kim, guest LVEA yes Tour 18:36
17:28 VAC Gerardo, Jordan LVEA yes Checking on AIP BSC 18:03
17:34 CDS Fil, Marc CER yes OMC PZT power supply swap 18:02
17:34 FAC Tyler Mids n 3IFO checks 18:34
17:53 PCAL Tony, Francisco PCAL lab yes Setup meas. 18:06
18:11 CDS Marc LVEA yes Check on beir garten sat boxes 18:59
18:14 FAC Nelly EY n Tech clean 18:48
18:54 OPS Tony LVEA yes LVEA sweep 18:59
20:00 FAC Eric EY n Check on hvac 20:40
22:46 - Camilla, Leo, Leo's family OSB roof n Looking out from the roof 23:02
Displaying report 1-1 of 1.