TITLE: 07/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Long list of maintenance activities checked off for the day (Trello board). Relocking was uneventful, I tried playing with some gains and timers to help catch DRMI faster but I'm unsure this actually helped. We've been observing for 3.5 hours.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
21:06 | SAF | LVEA IS LASER HAZARD | LVEA | Y | LVEA IS LASER HAZARD | 22:03 |
14:58 | CDS/GC | Jonathan | MSR | n | GC switch swap | 15:24 |
15:01 | PCAL | Tony, Francisco | PCAL lab | yes | Prep for todays meas | 15:18 |
15:02 | FAC | Chris, Eric | Ends, Mids, Mech room | n | Fan lubing | 16:36 |
15:05 | FAC | Nelly | LVEA | yes | Tech clean | 16:16 |
15:06 | SEI | Jim | EY, EX | n | HEPI accumulator checks | 17:32 |
15:07 | FAC | Randy, Mitchell | high bay | n | Fork lift and crane equipment | 17:29 |
15:09 | VAC | Jordan, Janos | MY, EY | n | Turbopump functionality testing | 18:09 |
15:11 | - | Betsy | LVEA | yes | Parts hunt | 15:47 |
15:12 | IAS | Jason | LVEA | yes | FARO health check | 18:01 |
15:16 | CDS/SUS | Fil | EY | n | sat amp swap | 16:02 |
15:17 | SUS | Oli | CR | n | Sat amp swap tests, SR3 meas. | 18:26 |
15:22 | VAC | Norco | EX | n | LN2 fill | 17:17 |
15:26 | VAC | Gerardo | FCTE | n | Measuring cables | 16:03 |
15:28 | PCAL | Tony, Francisco, Tooba | EY | YES | PCAL meas. | 17:38 |
15:31 | CDS | Richard | CER Mezz, LVEA | Yes | Check on OMC PZT power supply | 16:03 |
15:32 | SQZ | Camilla, Leo, Jennie | LVEA | YES | SQZT7 work | 19:18 |
15:33 | CDS | Marc, Erik | CER Mezz | yes | Power supply swap for ITM esds | 16:26 |
15:42 | VAC | Janos | MX | n | Looking at LN2 with contractor | 16:06 |
15:47 | - | Betsy | EY, EX | n | Checking on safety space | 16:02 |
15:51 | CDS/VAC | Patrick | Office | n | PLC code update on h0vacmr | 16:31 |
16:06 | VAC | Janos | MY, MX | n | Checking on vac stuffs | 17:29 |
16:07 | VAC | Gerardo | EX | n | Checking and maybe fixing vac stuff | 16:36 |
16:17 | FAC | Nelly | EX | n | Tech clean | 17:16 |
16:38 | CDS/SUS | Fil, Marc | LVEA | yes | MC1,MC3 sat amp swap | 17:02 |
16:44 | FAC | Eric | MY | n | Damper fix | 18:02 |
17:13 | FAC | Chris | Mids, Ends, LVEA | YES | Checking for tanks | 18:45 |
17:16 | FAC | Nelly | FCES | n | Tech clean | 18:02 |
17:19 | - | Mike, Kim, guest | LVEA | yes | Tour | 18:36 |
17:28 | VAC | Gerardo, Jordan | LVEA | yes | Checking on AIP BSC | 18:03 |
17:34 | CDS | Fil, Marc | CER | yes | OMC PZT power supply swap | 18:02 |
17:34 | FAC | Tyler | Mids | n | 3IFO checks | 18:34 |
17:53 | PCAL | Tony, Francisco | PCAL lab | yes | Setup meas. | 18:06 |
18:11 | CDS | Marc | LVEA | yes | Check on beir garten sat boxes | 18:59 |
18:14 | FAC | Nelly | EY | n | Tech clean | 18:48 |
18:54 | OPS | Tony | LVEA | yes | LVEA sweep | 18:59 |
20:00 | FAC | Eric | EY | n | Check on hvac | 20:40 |
22:46 | - | Camilla, Leo, Leo's family | OSB roof | n | Looking out from the roof | 23:02 |