Reports until 16:35, Thursday 24 July 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:35, Thursday 24 July 2025 (85965)
Ops Day Shift End

TITLE: 07/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Calibration and commissioning time today. We had one lock loss that ended a 21 hour lock, and now an earthquake is rolling through delaying relocking.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
21:06 SAF LVEA IS LASER HAZARD LVEA Y LVEA IS LASER HAZARD 22:03
16:29 - Corey Opt Lab n Parts hunt 16:48
17:01 - Corey MX n Parts hunt 17:23
17:06 VAC Janos, Anna MX n Looking around, checks 18:28
21:50 CDS Dave Mech room N Take down temporary camera 22:58
22:45 VAC Gerardo, Jordan FCTE n Checking on vac things 23:05