Peter King, Joe Gleason We ran the cables coming from the ether-cat chassis into the PSL for the mechanized rotation stage and connected them to the controller box on the PSL table. We also connected the lock out mechanism cable to the box and ran that cable outside the PSL near the Light Pipe. The excess is coiled up behind the cooling pipes under the light pipe area and needs to have the lock out device attached and the box mounted to the wall. Once the lock out box is attached and mounted the stage can be tested and installed in the beam path with the HWP from the old stage. Currently the stage is sitting along side the mechanical stage on the PSL table.