Koji A., Jeff B., Andres R., Jeff L.
The OMC was moved into HAM6 this morning. The move from the cleanroom and into the chamber was smooth with no issues. The OMC is sitting off to the North side of the ISI table to allow access for IAS. The cookie cutter (used to position the OMC structure) is attached at the correct location on the ISI table for future use. The structure is held with a few dog clamps. The rest of the dog clamps, screws and washers are in a foil bag next to the structure in the chamber.