TITLE: 08/04 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Corey
SHIFT SUMMARY:
H1 was locked for a good 6 hours then had an unknown lockloss.
Relocking was interupted at LOWNOISE_COIL_DRIVERS, due to a 6.2 M earth_quake whcih took H1 to DOWN.
H1 is currently waiting in Earthquake mode.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
21:34 | SPI | Tony | PCAL Lab | Yes | Testing beam Splitter ratio analysis tools | 22:13 |