Reports until 16:30, Monday 04 August 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:30, Monday 04 August 2025 (86167)
Ops Day Shift End

TITLE: 08/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Commissioning started the shift with one lock loss and a longer recovery. After we finally got back up we have been observing now for 2 hours.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:53 FAC Kim, Nelly MY, MX n Tech clean 15:44
15:27 CDS Fil MY n Pick up equipment 15:49
15:33 FAC Kim Opt lab n Tech clean 15:50
16:05 PEM Robert LVEA n Meas setup 18:41
17:26 CDS Erik Office n nuc5 work 17:46
18:20 PCAL Rick PCAL lab - Looking for something 18:50
19:48 VAC Janos MX n Looking at pump 21:21
20:27 - Randy LVEA n Checking for fans 20:36
21:32 VAC Travis Mids n Drop off gauge 22:02
23:02 SUS Ryan Opt Lab n Parts hunt 23:23