Displaying report 1-1 of 1.
Reports until 23:00, Monday 18 November 2013
H1 IOO (IOO, PSL)
cheryl.vorvick@LIGO.ORG - posted 23:00, Monday 18 November 2013 (8617)
IO work in HAM2 and HAM3

- Kiwamu, Keita, Cheryl


- checked MC REFL rerouted as IMC TRANS alignment through the irises and FI and to PSL ISS - good
- checked flashing IMC through irises and FI and to PSL ISS - good
- set up PSL ISS QPD to read the signal from 1064nm light - was able to see DC change with MC REFL beam when blocked and unblocked
- removed iris hardware from HAM3 stage 0
- removed irises from HAM2 table top
- proposed to MikeL that Keita and Kiwamu align the beam to the PSL ISS, now that software is set up - not sure if this happened

Also:
- noted that the PSL ISS was out of position w.r.t. top level assembly drawing for HAM2
- noted that the curved steering mirror for the PSL ISS, AROM RH2, was out of position w.r.t. top level assembly drawing for HAM2
- noted that the baffle, HA11, is out of position w.r.t. top level assembly drawing for HAM2

I've emailed Calum about the position difference of the PSL ISS.

Images attached to this report
Displaying report 1-1 of 1.