- Kiwamu, Keita, Cheryl
- checked MC REFL rerouted as IMC TRANS alignment through the irises and FI and to PSL ISS - good
- checked flashing IMC through irises and FI and to PSL ISS - good
- set up PSL ISS QPD to read the signal from 1064nm light - was able to see DC change with MC REFL beam when blocked and unblocked
- removed iris hardware from HAM3 stage 0
- removed irises from HAM2 table top
- proposed to MikeL that Keita and Kiwamu align the beam to the PSL ISS, now that software is set up - not sure if this happened
Also:
- noted that the PSL ISS was out of position w.r.t. top level assembly drawing for HAM2
- noted that the curved steering mirror for the PSL ISS, AROM RH2, was out of position w.r.t. top level assembly drawing for HAM2
- noted that the baffle, HA11, is out of position w.r.t. top level assembly drawing for HAM2
I've emailed Calum about the position difference of the PSL ISS.