jason.oberling@LIGO.ORG - posted 10:42, Tuesday 19 November 2013 (8620)
WBSC3 ITMx Alignment, Final Number Collection
Putting all the final alignment numbers for ITMx into one log to make it easier to find in the future.

1: We had to tear down our equipment at the X manifold spool for the spool re-install before the ITMx HR First Contact was removed, therefore we will not get a chance to measure the pitch after the FC removal.  We have to trust that the calculations in E1200791 are correct and the ITMx pitch will be within ±50 µrad of its 619 µrad down target pitch after the FC is removed.