ryan.short@LIGO.ORG - posted 16:36, Tuesday 05 August 2025 (86212)
Ops Day Shift Summary

TITLE: 08/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 147Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Relatively straightforward maintenance day where we were able to get back to observing before 1pm local time before a fire alarm caused a lockloss. Relocking was a bit of a struggle with DRMI taking a long time, but after running another initial alignment, H1 relocked without issue on its own. H1 has been locked and observing for just over an hour.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:00 FAC Randy, Mitchell LVEA N Craning for BSC2 platform install 17:00
15:02 FAC Kim, Nelly LVEA N Technical cleaning 16:24
15:03 FAC Chris All bldgs. N Pest ctrl 17:21
15:04 VAC Janos MX N Pump installation 19:03
15:08 CDS Fil LVEA N BSC2 platform work, JAC electronics install, HAM6 rack work 15:44
15:10 FAC Tyler LVEA N Moving Genie lift 17:04
15:14 VAC Gerardo LVEA N Starting pumps 17:14
15:14 FAC Eric MER N Checking heating coil 15:25
15:19 VAC Travis MX/FCES/LVEA N Pump installation 19:03
15:30 PSL RyanS, Jason CR N PMC/RefCav alignment 15:35
15:35 SUS Jason LVEA N Parts to OpLev cabinet 15:41
15:51 SUS Fil FCES N FC1/2 sat amp swaps 17:05
16:01 SEI Erik Remote N Restarting seismon 16:03
16:01 FAC Richard LVEA N Safety checks 16:16
16:36 FAC Nelly EY N Technical cleaning 17:27
16:36 FAC Kim EX N Technical cleaning 17:36
16:41 SUS Oli CR N SR3 & PR3 measurements 18:42
16:51 PEM RyanC LVEA N Looking for dust monitor 17:14
17:01 FAC Mitchell, Randy EY N Removing BSC braces 17:48
17:06 SUS Fil LVEA N OMC, IM sat amp swaps 17:59
17:13 SEI Jim EX N Cleaning off HEPI pump station 17:53
17:17 CDS Erik Remote N Rebooting digivideo2 17:27
17:17 EPO Camilla, Leo +1 LVEA N Tour 17:58
17:21 FAC Chris LVEA N FAMIS checks 18:35
17:28 FAC Nelly FCES N Technical cleaning 17:58
17:35 PEM Robert, Sam LVEA, OptLab N Noise hunting 18:04
17:40 FAC Kim FCES N Technical cleaning 17:58
17:48 FAC Mitchell, Randy EX N Looking for parts 18:26
17:50 SUS Jeff LVEA N Check on Fil, take pictures 18:01
18:00 CDS Fil LVEA N Measuring table cable lengths 18:04
18:04 EPO Camilla, Leo +1 OSB Roof N Tour 18:14
18:08 PEM Robert, Sam LVEA N Mounting accelerometer 18:41
18:24 ISC Keita LVEA N Grabbing parts 18:36
18:34 TCS Camilla, TJ LVEA N Moving laser into LVEA 18:47
18:42 VAC Gerardo LVEA N Turning off pumps 19:15
18:53 SAF Camilla LVEA YES Transition to HAZARD; sweep 19:23
19:33 PEM Robert LVEA - Removing temporary tape 19:41
19:33 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD Ongoing
20:12 PEM Gerardo LVEA - Powering off pumps 20:21
20:22 VAC Janos, Travis, Anna MX N Pump installation 22:09
21:32 SEI Tony, Rick PCal Lab Local SPI characterization Ongoing