thomas.shaffer@LIGO.ORG - posted 16:30, Thursday 07 August 2025 (86243)
Ops Day Shift End

TITLE: 08/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Locked for 4 hours, observing for 35min. Had a bit of a pivot today since we needed to clear some tumbleweeds from the overpass. This took up much of our commissoining time, as well as an earthquake delaying lock reacquistion, so we were approved for some afternoon commissioning.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:33 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD 11:33
15:02 SPI Jeff Opt Lab YES Fiber collimation 18:41
15:35 PEM Robert LVEA YES Measurement setup and peeking through viewports 18:34
15:42 FAC Chris, Randy Overpass n Tumbleweed clearing 18:35
16:09 VAC Janos, Anna MX, MY n Taking a look 16:37
16:13 FAC Kim, Nelly OSB rec. n Opening rollup door and driving out stuffs 16:53
18:05 ISC Jennie, Francisco Opt Lab YES Using laser and oscilliscope 18:05
18:48 VAC Gerardo LVEA yes Checking on turbo pumps 18:58
19:34 PEM Robert LVEA YES Pictures at view ports 21:34
20:38 ISC Elenna LVEA YES Plugging in cable at PSL racks 20:58
20:58 FAC Tyler EY n Chiller yard check 21:28
22:00 ISC Elenna LVEA YES Unplugging cable at PSL racks 22:05
22:27 PEM Robert LVEA YES Shutting measurements down 22:33
22:28 PCAL Francisco PCAL lab Yes PCAL or SPI 22:31
23:05 ISC Jennie Opt Lab YES ISS array work 23:24