TITLE: 08/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Locked for 4 hours, observing for 35min. Had a bit of a pivot today since we needed to clear some tumbleweeds from the overpass. This took up much of our commissoining time, as well as an earthquake delaying lock reacquistion, so we were approved for some afternoon commissioning.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
19:33 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | 11:33 |
15:02 | SPI | Jeff | Opt Lab | YES | Fiber collimation | 18:41 |
15:35 | PEM | Robert | LVEA | YES | Measurement setup and peeking through viewports | 18:34 |
15:42 | FAC | Chris, Randy | Overpass | n | Tumbleweed clearing | 18:35 |
16:09 | VAC | Janos, Anna | MX, MY | n | Taking a look | 16:37 |
16:13 | FAC | Kim, Nelly | OSB rec. | n | Opening rollup door and driving out stuffs | 16:53 |
18:05 | ISC | Jennie, Francisco | Opt Lab | YES | Using laser and oscilliscope | 18:05 |
18:48 | VAC | Gerardo | LVEA | yes | Checking on turbo pumps | 18:58 |
19:34 | PEM | Robert | LVEA | YES | Pictures at view ports | 21:34 |
20:38 | ISC | Elenna | LVEA | YES | Plugging in cable at PSL racks | 20:58 |
20:58 | FAC | Tyler | EY | n | Chiller yard check | 21:28 |
22:00 | ISC | Elenna | LVEA | YES | Unplugging cable at PSL racks | 22:05 |
22:27 | PEM | Robert | LVEA | YES | Shutting measurements down | 22:33 |
22:28 | PCAL | Francisco | PCAL lab | Yes | PCAL or SPI | 22:31 |
23:05 | ISC | Jennie | Opt Lab | YES | ISS array work | 23:24 |